Duruojije Road Emergency Repairs
Emergency Repairs of Failed and Unmotorable Sections of Duruojije Internal Roads and its Environs

Emergency Repairs of Failed and Unmotorable Sections of Duruojije Internal Roads and its Environs

Rapid infrastructure intervention to restore vehicular access and stabilize failed road sections in Mbaitoli L.G.A.

This emergency intervention by the NDDC aims to address the critical failure of internal road networks within Mbaitoli L.G.A.. The project focuses on reclaiming impassable routes to ensure safe and seamless movement for residents and commerce.
  • Client NIGER DELTA DEVELOPMENT COMMISSION (NDDC)
  • Project Title Emergency Repairs of Failed and Unmotorable Sections of Duruojije Internal Roads and its Environs.
  • Location MBAITOLI L.G.A., IMO STATE
  • Share
  • Project Starting Date

    12.08.2025

  • Project End

    12.08.2025

Emergency Repairs of Failed and Unmotorable Sections of Duruojije Internal Roads and its Environs

The project entails the urgent rehabilitation of critical infrastructure within the Duruojije community and surrounding areas in Mbaitoli L.G.A., Imo State. The primary objective is to address severe pavement failures, deep gully erosion, and waterlogged sections that have rendered the internal roads impassable for vehicular traffic. The intervention includes, but is not limited to: Site Clearance and Earthworks involving the removal of debris, unsuitable materials, and silt from the affected road corridors; Scarification and Filling which consists of breaking down failed sections and filling with approved lateritic materials or stone base to stabilize the sub-grade; Drainage Restoration focused on de-silting existing drains and constructing new reinforced concrete culverts or line drains to ensure proper water discharge and prevent future washouts; Pavement Reinforcement comprising the application of base courses and surfacing including priming and asphaltic concrete or surface dressing to provide a durable, all-weather motorable surface; and Erosion Control through the implementation of stone pitching or gabion structures in high-slope areas to protect the road shoulders from further degradation.

Work Scope

This project entails the urgent rehabilitation of critical infrastructure within the Duruojije community and surrounding areas in Mbaitoli L.G.A., Imo State. The primary objective is to address severe pavement failures, deep gully erosion, and waterlogged sections that have rendered the internal roads impassable for vehicular traffic.

The intervention includes, but is not limited to: Site Clearance and Earthworks involving the removal of debris, unsuitable materials, and silt from the affected road corridors; Scarification and Filling which entails breaking down failed sections and filling with approved lateritic materials or stone base to stabilize the sub-grade; Drainage Restoration focused on de-silting existing drains and constructing new reinforced concrete culverts or line drains to ensure proper water discharge and prevent future washouts; Pavement Reinforcement consisting of the application of base courses and surfacing such as priming and asphaltic concrete or surface dressing to provide a durable, all-weather motorable surface; and Erosion Control through the implementation of stone pitching or gabion structures in high-slope areas to protect the road shoulders from further degradation.
Work Scope